Nuclear Construction & Installation
(Electricity/Instrumentation)
- • NIMS Replacement Works for Standard Nuclear Power Plant
- • ECSA Facility Improvement of Hanbit Unit 1 and 2
- • Replacement and Removal of In-Car Radiation(Q) Monitoring and Control System with Hanbit Unit 1
- • Supply and Construction of Terminal Box for Sin-Gori Unit 6 RCP
- • Hanul Power Plant Lighting Equipment Maintenance Corporation
- • Removal and installation of facilities improvement of Sin-Kori 1, 2 and Sin-WolSung 1, 2 control rod control system
- • Installation of Security Facilities on the Outer Gate of Radiation
- • Management Area of the 1st Power Plant of the Saeul Headquarters
- • Field related to the installation of hydrogen reduction facilities in containment buildings of Hanul Unit 1 and 2
- • Demolition and installation of the DRCS facilities for Gori Unit 3 and 4 and Hanbit Unit 1 and 2
- • CV MOV ECSA Assembly For Kori NPP Unit 3 & 4
- • Relocation and demolition of electrical and security facilities in Sin-Gori Unit 5 and 6 sites
- • Installation and construction of ASTS standard / non-standard nuclear power plants(all plants)
- • Replacement of ICI for Hanul Unit 4
- • Generator Diagnosis Monitoring System
- • Replacement of SFP(Spent Fuel Pool) Safety Rating Instruments after Using Hanul Unit 1 and 2
- • New Communications Construction for the UAE OSSA Simulator Building and Office Building
- • Construction of Uljin 1-Bal Main Turbine Accelerator
- • 345kV Switchyard Power Disconnecting Construction
- • Additional Construction on the Improvement of Gori-1
- • Replacement of 480V MCC for Kori Unit 3 and 4
- • Construction of the dismantling and installation of the female flag of Uljin Unit 1 and 2
- • Yeonggwang Unit 1 and 2 on-road Nuclear Measurement(NIS) Replacement Corporation
- • Gori No. 4 Turbine Static Monitoring Facility Improvement Project
- • Uljin Unit 1 and 2 Power Generators Replacement Project
- • Gori-2 electrolytic chlorine facility
- • Construction design and installation of Gori-2 main control center alarm system replacement construction